18
Installation procedures
With the site requirements completed, the enclosure designed, and the drive
unpacked, you are ready to begin the installation. The following procedures are
included in drive installation:
• Setting the control board jumpers
• Installing the power supply
• Attaching an optional bezel
• Mounting the drive
• Connecting the system I/O cabling
• Grounding the system
• Synchronizing the spindle
Setting the control board jumpers
Caution. Do not remove the control board to set jumpers.
The control board on the drive contains a number of jumpers that must be set
correctly for normal operation of the drive. Figure 7 identifies jumpers, gives their
locations on the control board, and lists the possible settings for normal drive
operation.
Comments to this Manuals